A two-block stretch of 18th Street is closed for repairs on weekdays between 8 a.m. and 5 p.m. for the next month or so, according to San Francisco Public Works.
A team from Public Works is installing curb ramps and bus pads at Guerrero and Dolores Streets. While the work goes on, barriers will go up between Valencia and Dolores streets.
“We also will be doing street-base repair work, essentially rebuilding degraded portions of the roadway, and then paving the stretch,” Rachel Gordon, director of policy and communications, wrote in an email
The weather delays will mean another month of work, she wrote.
Traffic will flow as usual before 8 a.m., after 5 p.m., and all day on Saturdays and Sundays. Buses will also be allowed through during the construction period. Updates for this and other projects can be found here.
I’ve been a Mission resident since 1998 and a professor emeritus at Berkeley’s J-school since 2019. I got my start in newspapers at the Albuquerque Tribune in the city where I was born and raised. Like many local news outlets, The Tribune no longer exists. I left daily newspapers after working at The New York Times for the business, foreign and city desks. Lucky for all of us, it is still here.
As an old friend once pointed out, local has long been in my bones. My Master’s Project at Columbia, later published in New York Magazine, was on New York City’s experiment in community boards.
As founder/executive editor at ML, I've been trying to figure out how to make my interest in local news sustainable. If Mission Local is a model, the answer might be that you - the readers - reward steady and smart content. As a thank you for that support we work every day to make our content even better.
More by Lydia Chávez